Construction of revetment on the left Sava River bank in Mlaka, rkm 498+961 to rkm 499+761

EIA procedure was finished for Arranging of Sava waterway and defining regulatory line of Sava from Račinovac to Sisak, , part of which is this particular construction and Decision on acceptabillity for environment Class: UP/I-351-03/09-02/98, Reg. No: 531-14-1-1-02-10-42 was issued by Ministry of enviromental and nature protection on 03 November 2010. Decision is part of Location permit dated 30 May 2011