Reconstruction of right Sava River dike from km 22+700 to km 24+370 between Martinska Ves Desna and Ljubljanica

EIA procedure was finished for overall Flood protection system of Central Posavina, part of which is this particular reconstruction and Decision on acceptabillity for environment Class: UP/I-351-03/07-02/54, Reg. No: 531-08-1-1-2-6-08-11 was issued by Ministry of environmental protection, phisically planning and construction  on 20 May 2008. The Decision is part of location permit issued on 14 December 2012.