- Odaberite područje

Trajanje projekta: 01.09.2025. – 31.08.2029.
Ukupna vrijednost projekta: 8.019.898,75 €
EU sufinanciranje (100%): 7.521.499,38 €
Za Hrvatske vode EU sufinanciranje je 100%: 544.137,50 €
NAZIV PROJEKTA
Sustainable Water and Integrated Management of Fish Migration and their Habitats in the Danube River Basin and NW Black Sea
Broj projekta: 101215230 — HORIZON-MISS-2024-OCEAN-01
Akronim projekta: SWIM
PROJEKTNI PARTNERI
U projektu sudjeluju sljedeći partneri:
Glavni koordinator projekta
1. SVEUČILIŠTE U ZAGREBU, FAKULTET STROJARSTVA I BRODOGRADNJE (UZ-FSB)
Ostali partneri
2. KATHOLISCHE UNIVERSITAT EICHSTATT-INGOLSTADT (KUEI)
3. INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE DELTA DUNARII (DDNI)
4. HRVATSKE VODE PRAVNA OSOBA ZA UPRAVLJANJE VODAMA (HRVODE)
5. DANUBE DELTA BIOSPHERE RESERVE AUTHORITY (DDBRA)
6. HRVATSKE VODE PRAVNA OSOBA ZA UPRAVLJANJE VODAMA (HRVODE)
7. Internationale Arbeitsgemeinschaft Donauforschung (IAD) - International Association for Danube Research (IAD)
8. INSTITUTE OF HYDROBIOLOGY OF THE NATIONAL ACADEMY OF SCIENCES OF UKRAINE (IHB)
9. CENTAR KOMPETENCIJA d.o.o. ZA ISTRAŽIVANJE I RAZVOJ (CEKOM)
10. JADRANSKI INOVACIJSKI CENTAR (AIH)
11. TECHNICKA UNIVERZITA V KOSICIACH (TUKE)
12. UNIVERZITET U NOVOM SADU, POLJOPRIVREDNI FAKULTET NOVI SAD (UNSFA)
13. METCENAS OPS (MET)
14. CESKA ZEMEDELSKA UNIVERZITA V PRAZE (CZU)
15. GEOSTUD SRL (GEOS)
16. MEDUNARODNI CENTAR ZA ODRZIVI RAZVOJ ENERGETIKE VODA I OKOLISA UDRUGE (SDEWES)
17. Vyzkumny ustav vodohospodarsky T.G. Masaryka, v.v.i. (TGM WRI)
18. JAVNA USTANOVA ZA UPRAVLJANJE ZASTICENIM DIJELOVIMA PRIRODE I EKOLOSKOM MREZOM VIROVITICKO-PODRAVSKE ZUPANIJE (JU VPZ)
19. JAVNO PREDUZECE ZA NACIONALNE PARKOVE - PODGORICA (JPNPCG)
20. MINISTARSTVA PROMETA, VEZA I ZASTITE OKOLISA ZUPANIJE POSAVSKE (MPVIZO)
21. PRIVREDNA KOMORA SRBIJE (CCIS)
22. FZI FORSCHUNGSZENTRUM INFORMATIK (FZI)
23. SRU ODRA VELIKA GORICA (ŠRU-ODRA)
24. INSTITUTUL NATIONAL DE HIDROLOGIE SI GOSPODARIRE A APELOR (INHGA)
25. COMPLEX DELTA SRL (COMPLEX)
26. HIDROING D.O.O. za projektiranje i inzenjering (HIDROING)
27. INOVA+ - INNOVATION SERVICES, SA (INOVA)
*Su-financirano sredstvima Europske unije. Izneseni stavovi i mišljenja su stavovi i mišljenja
autora i ne moraju se podudarati sa stavovima i mišljenjima Europske unije ili CINEA. Ni
Europska unija ni CINEA ne mogu se smatrati odgovornima za njih.

Project duration: 1 September 2025. – 31 August 2029.
Total project value: 8.019.898,75 €
EU HORIZON co-financing (100%): 7.521.499,38 €
Croatian waters EU co-financing (100%): 544.137,50 €
PROJECT NAME
Sustainable Water and Integrated Management of Fish Migration and their Habitats in the Danube River Basin and NW Black Sea
Project reference: 101215230 — HORIZON-MISS-2024-OCEAN-01
Project acronym: SWIM
PROJECT PARTNERS
The project partners are the following:
Project coordinator:
1. SVEUČILIŠTE U ZAGREBU, FAKULTET STROJARSTVA I BRODOGRADNJE (UZ-FSB)
Project partners:
2. KATHOLISCHE UNIVERSITAT EICHSTATT-INGOLSTADT (KUEI)
3. INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE DELTA DUNARII (DDNI)
4. HRVATSKE VODE PRAVNA OSOBA ZA UPRAVLJANJE VODAMA (HRVODE)
5. DANUBE DELTA BIOSPHERE RESERVE AUTHORITY (DDBRA)
6. HRVATSKE VODE PRAVNA OSOBA ZA UPRAVLJANJE VODAMA (HRVODE)
7. Internationale Arbeitsgemeinschaft Donauforschung (IAD) - International Association for Danube Research (IAD)
8. INSTITUTE OF HYDROBIOLOGY OF THE NATIONAL ACADEMY OF SCIENCES OF UKRAINE (IHB)
9. CENTAR KOMPETENCIJA d.o.o. ZA ISTRAŽIVANJE I RAZVOJ (CEKOM)
10. JADRANSKI INOVACIJSKI CENTAR (AIH)
11. TECHNICKA UNIVERZITA V KOSICIACH (TUKE)
12. UNIVERZITET U NOVOM SADU, POLJOPRIVREDNI FAKULTET NOVI SAD (UNSFA)
13. METCENAS OPS (MET)
14. CESKA ZEMEDELSKA UNIVERZITA V PRAZE (CZU)
15. GEOSTUD SRL (GEOS)
16. MEDUNARODNI CENTAR ZA ODRZIVI RAZVOJ ENERGETIKE VODA I OKOLISA UDRUGE (SDEWES)
17. Vyzkumny ustav vodohospodarsky T.G. Masaryka, v.v.i. (TGM WRI)
18. JAVNA USTANOVA ZA UPRAVLJANJE ZASTICENIM DIJELOVIMA PRIRODE I EKOLOSKOM MREZOM VIROVITICKO-PODRAVSKE ZUPANIJE (JU VPZ)
19. JAVNO PREDUZECE ZA NACIONALNE PARKOVE - PODGORICA (JPNPCG)
20. MINISTARSTVA PROMETA, VEZA I ZASTITE OKOLISA ZUPANIJE POSAVSKE (MPVIZO)
21. PRIVREDNA KOMORA SRBIJE (CCIS)
22. FZI FORSCHUNGSZENTRUM INFORMATIK (FZI)
23. SRU ODRA VELIKA GORICA (ŠRU-ODRA)
24. INSTITUTUL NATIONAL DE HIDROLOGIE SI GOSPODARIRE A APELOR (INHGA)
25. COMPLEX DELTA SRL (COMPLEX)
26. HIDROING D.O.O. za projektiranje i inzenjering (HIDROING)
27. INOVA+ - INNOVATION SERVICES, SA (INOVA)
*Co-funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

Projekt SWIM (Sustainable Water and Integrated Management of Fish Migration and their Habitats in the Danube River Basin and NW Black Sea) usmjeren je na obnovu povezanosti riječnih ekosustava, poboljšanje uvjeta za migraciju riba te očuvanje i obnovu njihovih ključnih staništa u dunavskom slivu i sjeverozapadnom dijelu Crnog mora. Projekt se provodi na području jedanaest zemalja Dunavskog bazena i okuplja 26 partnera koji zajednički rade na unaprjeđenju održivog i integriranog upravljanja vodnim resursima.
Projektno područje u Republici Hrvatskoj obuhvaća Noskovačku baru, značajan rukavac rijeke Drave smješten u Virovitičko-podravskoj županiji. Noskovačka bara nastala je odvajanjem nekadašnjeg meandra Drave te je povijesno predstavljala važno stanište za mriještenje, razvoj i prehranu ribljih populacija. Tijekom vremena prirodna povezanost rukavca s matičnim tokom Drave postupno je narušena zbog sedimentacije, promjena vodostaja i smanjenja protoka vode, kao i razvoja tršćaka i druge močvarne vegetacije. Posljedica toga je smanjenje ekološke funkcionalnosti rukavca, gubitak dijela biološke raznolikosti i degradacija staništa, ali i smanjenje njegove funkcije retencijskog prostora tijekom visokih vodostaja Drave.
U okviru projekta SWIM na pilot području Noskovačke bare provodit će se aktivnosti usmjerene na obnovu hidromorfološke i ekološke povezanosti rukavca s rijekom Dravom, poboljšanje uvjeta za migraciju riba i obnovu degradiranih vodenih i močvarnih staništa. Aktivnosti će se temeljiti na kombinaciji terenskih istraživanja, praćenja migracije riba, hidrološkog i hidromorfološkog modeliranja, primjeni suvremenih tehnologija monitoringa te provedbi prirodno utemeljenih rješenja (Nature-Based Solutions – NBS).
Hrvatski doprinos projektu provodi se kroz suradnju Sveučilišta u Zagrebu, Fakulteta strojarstva i brodogradnje, Hrvatskih voda, Hidroinga d.o.o., Javne ustanove za upravljanje zaštićenim dijelovima prirode i ekološkom mrežom Virovitičko-podravske županije, Centra kompetencija d.o.o., Međunarodnog centra za održivi razvoj energetike, voda i okoliša, Jadranskog inovacijskog centra te Športskog ribolovnog društva Odra Velika Gorica. Hrvatske vode u projektu imaju važnu ulogu zahvaljujući dugogodišnjem iskustvu u upravljanju vodnim resursima, praćenju stanja voda i planiranju i provedbi mjera obnove vodnih ekosustava.

The SWIM project (Sustainable Water and Integrated Management of Fish Migration and their Habitats in the Danube River Basin and NW Black Sea) aims to restore the connectivity of river ecosystems, improve conditions for fish migration, and protect and restore key fish habitats across the Danube River Basin and the north-western Black Sea region. The project is implemented across eleven countries of the Danube Basin and brings together 26 partners working towards more sustainable and integrated management of water resources.
In Croatia, the project area includes Noskovačka bara, an important Drava River side arm located in Virovitica-Podravina County. Noskovačka bara was formed from a former meander of the Drava River and historically represented an important habitat for fish spawning, development and feeding. Over time, the natural connection between the side arm and the main Drava channel has gradually deteriorated due to sediment accumulation, changes in water levels and reduced water discharge, as well as the expansion of reed beds and other wetland vegetation. These processes have resulted in reduced ecological functionality of the side arm, loss of part of its biodiversity and degradation of aquatic habitats, while also reducing its function as a retention area during high Drava water levels.
Within the SWIM project, activities at the Noskovačka bara pilot site will focus on restoring the hydromorphological and ecological connectivity of the side arm with the Drava River, improving conditions for fish migration, and restoring degraded aquatic and wetland habitats. The activities will combine field investigations, fish migration monitoring, hydrological and hydromorphological modelling, the application of modern monitoring technologies and the implementation of Nature-Based Solutions (NBS).
The Croatian contribution to the project is implemented through cooperation between the University of Zagreb, Faculty of Mechanical Engineering and Naval Architecture, Hrvatske vode, Hidroing d.o.o., the Public Institution for the Management of Protected Areas and the Ecological Network of Virovitica-Podravina County, Centar kompetencija d.o.o., the International Centre for Sustainable Development of Energy, Water and Environment Systems, Adriatic Innovation Centre, and the Sport Fishing Association Odra Velika Gorica. Hrvatske vode play an important role in the project based on their long-standing experience in water resources management, water status monitoring, and the planning and implementation of measures for the restoration of aquatic ecosystems.
Glavni cilj projekta SWIM je pridonijeti obnovi funkcionalnih riječnih ekosustava i osigurati bolje uvjete za migraciju riba i povezanost njihovih ključnih staništa u dunavskom slivu. Projekt nastoji odgovoriti na posljedice višestoljetnih hidromorfoloških promjena, fragmentacije riječnih tokova, izgradnje vodnih građevina, onečišćenja i degradacije močvarnih i poplavnih staništa koji su značajno utjecali na stanje ribljih populacija i ukupnu bioraznolikost riječnih ekosustava.
Na hrvatskom pilot području Noskovačke bare cilj je obnoviti hidrauličku i ekološku povezanost rukavca s rijekom Dravom te poboljšati uvjete za migraciju i razmnožavanje riba. Posebna pažnja bit će usmjerena na poboljšanje protoka i dinamike vode, smanjenje posljedica sedimentacije i zarastanja te obnovu funkcionalnosti vodenih i močvarnih staništa. Istodobno se očekuje ponovno povećanje retencijske funkcije područja tijekom visokih vodostaja Drave, čime se obnova ekosustava povezuje s ciljevima održivog upravljanja vodama.
Projekt će primjenom suvremenih metoda monitoringa, uključujući bežičnu telemetriju, hidrološko i klimatsko modeliranje te digitalne alate za praćenje migracijskih koridora, omogućiti kvalitetnije razumijevanje kretanja riba i procesa koji utječu na funkcionalnost riječnih staništa. Prikupljeni podaci poslužit će kao osnova za planiranje i prioritizaciju budućih mjera obnove te za donošenje odluka utemeljenih na znanstvenim i stručnim podacima.
Očekivani rezultati uključuju poboljšanu povezanost riječnih staništa, obnovu degradiranih dijelova riječnog sustava, povećanje dostupnosti pogodnih staništa za migraciju, mriještenje i razvoj riba te jačanje ukupne ekološke otpornosti riječnog ekosustava. Na razini dunavskog sliva projekt će dodatno pridonijeti povezivanju institucija, stručnjaka i lokalnih dionika te razvoju zajedničkog pristupa održivom upravljanju vodama i očuvanju migratornih vrsta riba.
Konačni očekivani rezultat projekta je uspostava učinkovitijeg, integriranog i na podatcima utemeljenog pristupa obnovi riječnih ekosustava koji će se moći primijeniti i na druga područja Dunavskog sliva i šire.
The overall objective of the SWIM project is to contribute to the restoration of functional river ecosystems and improve conditions for fish migration and connectivity between key fish habitats within the Danube River Basin. The project addresses the impacts of centuries of hydromorphological alterations, river fragmentation, construction of water infrastructure, pollution, and degradation of wetland and floodplain habitats, which have significantly affected fish populations and the overall biodiversity of river ecosystems.
At the Croatian pilot site of Noskovačka bara, the objective is to restore the hydraulic and ecological connectivity of the side arm with the Drava River and improve conditions for fish migration and reproduction. Particular attention will be given to improving water flow and hydrological dynamics, reducing the impacts of sediment accumulation and vegetation overgrowth, and restoring the functionality of aquatic and wetland habitats. At the same time, the restoration is expected to enhance the site's retention function during periods of high Drava water levels, thereby linking ecosystem restoration with sustainable water management objectives.
Through the application of advanced monitoring methods, including wireless telemetry, hydrological and climate modelling, and digital tools for monitoring fish migration corridors, the project will improve understanding of fish movements and the processes influencing the functionality of river habitats. The collected data will provide a basis for planning and prioritising future restoration measures and for supporting evidence-based water management decisions.
Expected results include improved connectivity between river habitats, restoration of degraded parts of the river system, increased availability of suitable habitats for fish migration, spawning and development, and enhanced overall ecological resilience of the river ecosystem. At the Danube Basin level, the project will also strengthen cooperation between institutions, experts and local stakeholders and contribute to the development of a common approach to sustainable water management and the conservation of migratory fish species.
The ultimate expected outcome of the project is the establishment of a more effective, integrated and data-driven approach to river ecosystem restoration that can be replicated and applied in other areas of the Danube Basin and beyond.
Dana 14. svibnja 2026. godine u Posjetiteljskom centru „Dravska priča“ održan je sastanak dionika u okviru aktivnosti na pilot području RS4.1, Noskovačka bara. Cilj sastanka bio je predstavljanje i razmatranje varijantnih tehničkih rješenja za restauraciju rukavca rijeke Drave te prikupljanje mišljenja i prijedloga relevantnih lokalnih i regionalnih dionika prije konačnog odabira tehničkog rješenja.
Na sastanku su, uz hrvatske projektne partnere, sudjelovali predstavnici lokalnih športskih ribolovnih udruga, lovačkih udruga, predstavnici lokalne i regionalne samouprave te lokalni poljoprivrednici i drugi korisnici prostora. Sudionicima su predstavljene osnovne značajke postojećeg stanja Noskovačke bare, identificirani hidromorfološki problemi te ciljevi planirane restauracije, s posebnim naglaskom na poboljšanje hidrološke povezanosti rukavca s rijekom Dravom, povećanje dinamike protoka i poboljšanje uvjeta za razvoj i očuvanje vodenih i močvarnih staništa.
Predstavljena su različita tehnička rješenja restauracije, uključujući mogućnosti poboljšanja ulaznog i izlaznog profila rukavca, uklanjanja odnosno preoblikovanja prepreka koje ograničavaju protok vode te optimizacije geometrije korita radi uspostave povoljnijih hidrauličkih uvjeta. Razmatrani su i mogući utjecaji predloženih zahvata na postojeće korištenje prostora, ribolov, lov, poljoprivredne aktivnosti i druge interese lokalne zajednice.
Tijekom rasprave dionici su iznijeli svoja mišljenja, prijedloge i primjedbe vezane uz predložene varijante, pri čemu su posebno razmotreni aspekti pristupa lokaciji, budućeg održavanja, uvjeta za ribolov i očuvanja postojećih funkcija područja. Prikupljene informacije predstavljale su važan ulaz za daljnju razradu tehničke dokumentacije i usklađivanje planiranih mjera s potrebama lokalne zajednice.
Na temelju provedene rasprave i razmotrenih tehničkih, okolišnih i društvenih aspekata, na kraju sastanka postignut je konsenzus o odabiru preferentnog varijantnog rješenja restauracije Noskovačke bare. Odabrano rješenje predstavljat će osnovu za daljnju tehničku razradu i pripremu dokumentacije potrebne za provedbu planiranih restauracijskih mjera na pilot području RS4.1.
Slika 1



Od 21. do 24. travnja 2026. godine u Pragu, Republici Češkoj, održan je drugi sastanak Generalne skupštine korisnika projekta SWIM (GAB2), na kojem su sudjelovali partneri projektnog konzorcija, uključujući predstavnike Hrvatskih voda.
Tijekom sastanka predstavljen je napredak projekta po radnim paketima te su kroz projektne radionice razmijenjena iskustva o provedbi aktivnosti, tehničkim rješenjima i izazovima u realizaciji planiranih zadataka. Projektni tim Hrvatskih voda predstavio je deliverable „Water Quality Monitoring Plan“, kojim su definirana područja uzorkovanja za svaku referentnu pilot lokaciju, metodologija prikupljanja uzoraka vode te fizikalni, kemijski i ekološki parametri koji će se analizirati u okviru monitoringa kvalitete vode.
Posebna pažnja posvećena je koordinaciji aktivnosti na referentnim lokacijama i dogovoru o narednim koracima u provedbi projekta.
U sklopu sastanka organiziran je i terenski posjet pilot području u slivu rijeke Morave. Sudionici su imali priliku upoznati se s postojećim stanjem područja te provedenim i planiranim mjerama usmjerenima na obnovu riječnih i močvarnih staništa i poboljšanje ekološkog stanja vodotoka.
Sastanak i terenski posjet bili su prilika za razmjenu praktičnih iskustava među partnerima te dodatno povezivanje aktivnosti usmjerenih na održivo upravljanje i obnovu vodnih ekosustava.
Slika 1




Dana 2. prosinca 2025. partneri odgovorni za referentne lokacije (RS) 4.1 i 4.2 – Hrvatske vode, Javna ustanova Priroda Virovitičko-podravske županije, Hidroing i ŠRU Odra, zajedno s vodećim partnerom UNIZG FSB i voditeljem WP6, AIH, sastali su se u Posjetiteljskom centru „Dravska priča“, u neposrednoj blizini lokacije SWIM RS4.1, Noskovačke bare.
Cilj sastanka bio je definirati vremenski plan i tijek aktivnosti potrebnih za uspješnu provedbu planiranih aktivnosti na RS4.1 i RS4.2. Na kraju sastanka sudionici su obišli virovitičke ribnjake, gdje će se uzgojene migratorne vrste riba prilagoditi uvjetima prirodnog staništa prije njihovog poribljavanja na području Noskovačke bare.
Slika 1


Projekt SWIM službeno je započeo u rujnu 2025. godine u Zagrebu, gdje su se okupili projektni partneri kako bi obilježili početak zajedničkog rada na obnovi staništa migratornih vrsta riba i poboljšanju stanja slatkovodnih ekosustava. Na sastanku su predstavljeni glavni ciljevi projekta, planirane aktivnosti i pristup provedbi mjera na sedam pilot područja. Poseban naglasak stavljen je na suradnju znanstvenih institucija, tijela javne uprave, nevladinih organizacija i lokalnih zajednica. Kick-off sastanak time je označio početak četverogodišnje suradnje usmjerene na obnovu bioraznolikosti, povećanje otpornosti riječnih ekosustava i dugoročno poboljšanje stanja voda u slivu Dunava i sjeverozapadnom dijelu Crnog mora.
Slika 1


On 14 May 2026, a stakeholder meeting was held at the Visitor Centre “Drava Story” as part of the activities implemented at the RS4.1 pilot site, Noskovačka Bara. The purpose of the meeting was to present and discuss alternative technical solutions for the restoration of the Drava River side arm and to collect feedback and recommendations from relevant local and regional stakeholders prior to the final selection of the preferred technical solution.
In addition to the Croatian project partners, the meeting was attended by representatives of local sport fishing associations, hunting associations, local and regional authorities, local farmers and other land users. The participants were presented with the existing conditions of Noskovačka Bara, the identified hydromorphological constraints and the objectives of the planned restoration, with particular emphasis on improving the hydrological connectivity of the side arm with the Drava River, enhancing flow dynamics and improving conditions for the development and conservation of aquatic and wetland habitats.
Several technical restoration options were presented, including possibilities for improving the inlet and outlet sections of the side arm, removing or modifying structures and other constraints limiting water flow, and optimising the channel geometry in order to establish more favourable hydraulic conditions. The potential impacts of the proposed interventions on existing land use, recreational fishing, hunting, agricultural activities and other local interests were also discussed.
During the discussion, stakeholders provided their views, recommendations and comments on the proposed alternatives. Particular attention was given to site accessibility, future maintenance requirements, conditions for recreational fishing and the preservation of existing functions and uses of the area. The information and feedback collected during the meeting provided an important basis for further development of the technical documentation and for aligning the planned restoration measures with the needs and interests of the local community.
Based on the discussion and consideration of the technical, environmental and socio-economic aspects of the proposed alternatives, the stakeholders reached a consensus on the selection of the preferred technical solution for the restoration of Noskovačka Bara. The selected solution will serve as the basis for further technical development and preparation of the documentation required for the implementation of the planned restoration measures at the RS4.1 pilot site.
Slika 1



From 21 to 24 April 2026, the second General Assembly of Beneficiaries of the SWIM project (GAB2) was held in Prague, Czech Republic, bringing together partners of the project consortium, including representatives of Croatian Waters.
During the meeting, project progress across the Work Packages was presented, while dedicated workshops provided an opportunity to exchange experience on project implementation, technical solutions and challenges. The Croatian Waters project team presented the deliverable “Water Quality Monitoring Plan”, which defines the sampling areas for each reference site, the methodology for water sample collection, and the physical, chemical and ecological parameters to be analysed as part of the water quality monitoring activities.
Particular attention was given to the coordination of activities at the reference sites and the next steps for the upcoming project period.
As part of the meeting, the participants also visited a pilot area in the Morava River basin. The field visit provided an opportunity to learn about the existing conditions of the area and the restoration measures implemented or planned to improve the ecological condition of watercourses and restore riverine and wetland habitats.
The meeting and field visit provided a valuable opportunity for partners to exchange practical experience and strengthen cooperation on sustainable water management and the restoration of aquatic ecosystems.
Slika 1




On the 2nd December 2025. Partners responsible for the Reference site (RS) 4.1 and 4.2 Croatian Waters, Public Institutions Nature Virovitca, Hidroing, ŠRU Odra together with lead partner UNIZG FSB and WP6 leader AIH met at the visitor center “The Drava Story” in the near proximity of the SWIM RS4.1 location Noskovačka bara.
The purpose of the meeting was to define the timeline and workflow of the activities necessary for the successful implementation of planned actions at RS4.1 and RS4.2. At the end of the meeting, participants visited the Virovitica ponds, where bred migratory fish will undergo adaptation to natural habitat conditions before being released into the Noskovačka bara area.
Slika 1


The SWIM project officially kicked off in September 2025 in Zagreb, bringing project partners together to mark the beginning of a joint effort to restore habitats for migratory fish species and improve the health of freshwater ecosystems. The meeting introduced the project's main objectives, planned activities and the implementation approach across seven pilot sites. Particular emphasis was placed on cooperation between research institutions, public authorities, non-governmental organisations and local communities. The kick-off meeting marked the beginning of a four-year collaboration aimed at restoring biodiversity, increasing the resilience of river ecosystems and contributing to the long-term improvement of water ecosystems across the Danube Basin and the north-western Black Sea region.
Slika 1





